The Greenhouse is Coming Together!

You are looking on the latch to the new door to the greenhouse!

 

We got one doorway up and the other doorway that will actually hold the exhaust fan up, but not finished yesterday and last night. There is an ‘inside’ and an ‘outside’ now!

Since we were working around rain showers, I spent a lot of my time sweeping the water off the black weed barrier. It had accumulated in large puddles. It’s raining even harder today. My husband is out in the shop doing ‘something,’ while I used the rain to do two loads of laundry, get a chicken chili in the crock pot for dinner, put sausage balls in the oven for our lunches, and cut up some leftovers to add some extra goodness to Molly’s dinners this week.

 

This is the doorway on which we’ll add diagonals and then horizontal pieces to hold the exhaust fan. We got a thermostat control for it, so we can control when the fan goes on and off.

 

I’m excited. When we finish the 2nd doorway, I think it’ll be time to think about how to tackle the issue of putting the film on the greenhouse. We’re using one sheet that goes over the whole thing at once. We’ll use 19″ strips of wood, wrap the film around them, and then screw them into the wood foundation on one side, and then stretch it over the greenhouse to the other side. I have no clue what we’ll do about the ends of the greenhouse…

Leave a comment

Filed under Lewis projects

Last Night’s Progress on Greenhouse

After installing two pvc straps for each rib of the skeleton during the day yesterday and painting the pvc pipe to keep it from giving off fumes in the sun that deteriorate the film we’re going to use, we got the skeleton up right before dark!

 

I wasn’t sure how difficult it would be to put the pvc pipe skeleton up, but I stood in the middle, holding the skeleton up as high as I could while my husband took the ribs one at a time and slipped them into the straps on one side of the greenhouse. Then it was easier to get them in on the other side. We then went all the way around, tightening the screws that held the pvc straps.

 

We’ve put in one session out there today, working on installing the door at one end. We decided to take a break, and then the rain started. When we have a chance to catch our breaths and the rain stops, we’ll do another session. It’s starting to come together!

Leave a comment

Filed under Lewis projects

Greenhouse Progress – Friday

Yesterday we put the 10 foot pieces of pvc pipe onto the ‘spine’ we had made previously.  Today we went to Yeagers and got 1 x 2’s and 1 x 4 x 12’s and a paint brush. When we got home from Lunch Bunch, I started painting the pvc pipes and connections while my husband created my door!

The film people warned us that if we just used the film and the pvc pipe, the fumes from the pvc in the sun would cause the film to deteriorate. My husband scoffed, but I took them seriously. They said that if we painted the pvc pipe with latex paint, it would solve the problem.

I spent 3 hours (2 sessions) out in the hot sun painting the white pvc pipe beige. It didn’t matter what color we chose. Apparently the latex paint barrier stops whatever the chemical reaction is between the pvc stuff and the film. I got really hot and tired, but I finally got two coats of paint on the side of the pvc pipe that will touch the film.

 

Here you can see the pvc pipes coming out of either side of the spine. This is what I was painting today. UGH.

 

Here’s another view of it. After I cooled off some, my husband was raring to go again, this time wanting to screw on the pvc pipe straps on the outside edge of the foundation on the 1×2’s my husband screwed on there earlier. We put two straps on for each end of the pvc pipe, screwed in loosely, until the ‘great pvc pipe raising’ we’ll do later this evening when the sun goes down some. I’m picturing standing the pvc pipe on end, one of us holding the pipe complex while the other one puts the end of the pipe in the straps and then tightens the screws. When one side is in, then the other side should go in more easily, with our bending the pipes down to go into the straps. Wish us luck, please.

Leave a comment

Filed under Lewis projects

Greenhouse Progress – Thursday, June 1st

Last time I showed you where our wonderful tractor guy, Eric, cleared some land for our proposed greenhouse.

 

This is the foundation of the greenhouse. It will be 12 feet wide x 14 feet long. You’re looking at it from the west, looking east.  We put down two sheets of black 4 mil plastic sheeting that we hope will keep the weeds from growing. This will be the floor of the greenhouse. When we get a bit farther, we’ll put rocks and bricks around the bottom to hold the sheeting in place better.

 

My husband made four of these stakes. The pipe is solid and 2 feet long. Then he welded on heavy angle iron, and then drilled a gazillion holes so that we could attach the foundation wood at whatever level needed for the structure to be as level as possible. Since the piece of land isn’t flat, and we run into solid rock at different depths for each stake, this is quite a process. We drilled as deeply as we could, then poured some water in the hole, and then used a sledge hammer to get the stakes in. Then we screwed the wood to the stakes after leveling it and making sure the corners were square.

 

This is another view.

 

This picture is taken from the south, looking north. We’re going to put the door on the north end and an exhaust fan on the south end.

We’ve had two sessions of work today, although we don’t have a lot to show for it, picture-wise.

We bought a sheet of plywood, lots of 2x4s, and lots of pvc pipes and fittings today. When we got home, we took it all out to the shop and cut it all up into the lengths we needed for the greenhouse. We cut the plywood sheet into strips 8 inches wide. We’re going to screw these pieces to the inside of the foundation wood you see here so we’ll have wood to the ground all around.

We made the ‘spine’ of the greenhouse that will go along the top of the oval we’ll make with the pvc pipe. We’ll attach 10 foot sections to the spine, bend them and attach them with straps along the outside perimeter of the greenhouse.

After we cut the pieces, we put it all in the truck again and carted it to the work site. My husband was wearing shorts and we have lots of briars out there, so I emptied the truck, putting things in piles around the foundation.

We rested, and then a wind came up and rain threatened, so we rushed out to the site and I started moving the stuff I had put in piles onto the black sheeting to keep it from blowing away. Everything is battened down now, but – BOY! – did I get my exercise for the day with all the pulling and hauling of supplies!

Things have calmed down outside now. I’m not sure if we’ll try to do another work session tonight before it gets dark or not. I can tell you that I should sleep well tonight…

 

Leave a comment

Filed under Lewis projects

Bird Bath – Almost There

Plumbing is a LOT more complicated than it might seem. After having the hummingbird bird bath together and apart again several times now, fighting leaks, we THINK it’s a go this time. I’m not feeling ANY moisture on the bottom side of the tub. The timer came on as scheduled and the little waterfall was making its pretty noise this morning.

 

I’m going to check it one more time and then will start putting in decorations that I hope will make the hummingbirds happy when they arrive.

I’ll take more pics later today.

 

Leave a comment

Filed under Lewis projects

Hummingbird Bird Bath – Try # 4

They say, “The third time’s the charm.” Apparently, we didn’t get the memo because we’re on “TRY # 4” to get the plumbing on the hummingbird bath not to leak. We got it back together again, hooked it up and ran it for awhile, only to find ANOTHER place water was seeping out. I logged about 7,100 steps on my pedometer yesterday with all the back and forth to the shop yesterday working on it.

We took that apart and put pipe dope on it and stuck it together again. We turned the water on again and didn’t see any leaks this time. We were going to check it again in half an hour, but then it started to rain. Until everything is dry again, we won’t know if we’ve been successful this time or not.

I’ve taken all the decoration out of the tub twice thus far. I’m not going to put anything in there until we’re sure we have the leak problem fixed. (I did get some nice-looking greenery to add at the store yesterday :0) )

Here is how the system looks now, as we test the plumbing –

 

If all goes well, I’ll plan to add decorations to the tub tomorrow. I’ll take pics when the decorations are in. Meanwhile, we hung up a feeder in case we have any hungry hummers in our area.

Leave a comment

Filed under Lewis projects

The Hummingbird Bird Bath is Finished!

The actual hummingbird bath is now finished. I’ll add plants on either side of the bath on the railings, plus a basket of flowers for the table, hummingbird feeder hanging above somewhere, etc., but the main project is finished.

 

I gathered things from around the house to put into the bath – a ceramic bath tub with a lady in it, three glass hummingbird feeders that were prettier than they were practical, shells, a frog, some aquarium decorations, some rocks, and some bricks – both for the decorations and in the middle for the hummingbirds to stand on, if they wish.

 

Here you can see the ‘stuff’ I’m hoping the hummingbirds will like. I can see myself changing things from time to time, which will be half the fun of the bird bath!

I LOVE the sound of the water. I really hadn’t thought of that, and I find it very appealing and relaxing. Between that, and the wind chimes from the back porch, it will make a great spot for us most of the year.

When the hummers come, I’m hoping they really like it. I’ll try to get some pics if they do.

 

 

4 Comments

Filed under Lewis projects

Phase 2 – Hummingbird Bird Bath Project

We finished the plumbing part of the hummingbird bird bath project today!  We had ‘gooed’ the drain pipe fitting last night and let it dry for 24 hours. We had to cut another hole in the bucket lid to accommodate the pipe coming from the bottom of the tub in a straighter fashion.  This set up will allow the bird bath to sit quietly when the pump is not on. When the pump IS on, the water recirculates from the tub, down into the bucket and back. The only water we’ll need to replace is from evaporation from time to time. We’ll put a timer between the pump and the electrical hookup so the water will be on in daylight and off at night.

 

Here we have the water on, making a kind of waterfall for the hummers.  The place we ‘gooed’ last night is good. We still had some drips from the place where we attach the pvc pipe to the side of the tub. Tightening the screws more got rid of the leaks. A happy thing we didn’t expect was the NICE sound the ‘waterfall’ makes!

 

Here’s a close up of the basic tub and waterfall.

Phase 3 will be gathering ‘stuff’ to put in the tub – greenery, rocks, bricks, fun decorations, etc. I’ll take pics again when I’ve gotten the decorating started.