Best Laid Plans

I was PLANNING to clean out another flower planter yesterday. My husband came in and told me we had a problem with the greenhouse. The end ‘wall’ you’re looking at in this photo had broken loose because the last pvc pipe ‘rib’ closest to the lumber had broken. The rib isn’t repairable. We would have to take the whole end of the greenhouse apart and replace the whole rib,  probably resulting in more damage.

My husband, who is really good at figuring out how to fix things, figured out that we could attach heavy wire (like that used in the guy wires for the ham radio tower) to the upright pieces of wood on either side of the louvered exhaust fan. He is outside as I type (waiting for an important phone call we’re expecting) drilling a hole some distance away from the end of the greenhouse. He’ll then pound in a metal stake with the sledge hammer. Then we’ll attach the wires with what I think are called turnbolts – metal things with rings on each end and a threaded length in between that you can turn to tighten the wire until it’s taught.

 

The stake and ‘guy wire’ type attachment should keep the end of the greenhouse secure. I’m not sure what he’s planning about the broken pvc pipe. Maybe we can just ignore it and rewrap the transparent liner stuff on the end carefully.

Anyhow, my best laid plans had to be set aside, once again, in order to try to fix the greenhouse – again before it is forecast to rain today…  I’m lucky to have a guy who can look at something and figure out how it works and what needs to be done to fix it. I don’t have a clue – although I’m a pretty good helper and ‘gofer.’

If I can get the yard under control for the winter, I’m planning to start moving things around in the greenhouse, getting ready for planting seeds later. I’ll post pics as I get things organized in there.

Leave a comment

Filed under Gardening, Housekeeping - Maintenance, Lewis projects

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.